HomeInfraFerrovial and BAM selected for UK’s HS2 project track infrastructure

Ferrovial and BAM selected for UK’s HS2 project track infrastructure

Date:

Related stories

Nine-year-old boy killed in Christmas market attack named – latest

Athena Stavrou22 December 2024 13:41Eyewitness describes ‘war-like conditions’In the...

Guinness raids its Irish reserves to ease UK shortages amid gen Z demand

Guinness is raiding its reserves in Ireland to boost...

UK banks’ trust account exodus cuts lifeline for disabled people, says charity

People with disabilities are facing potential hardship because banks...

Tottenham vs Liverpool live updates: Premier League predictions, team news and latest score

Capacity: 62,850First used: 2019London’s biggest club stadium was built...
spot_imgspot_img

Ferrovial, in a joint venture (JV) with BAM, has been selected for three contracts to design and build 140 miles of track infrastructure for the High-Speed 2 (HS2) rail project in the UK.




TINNews |

Ferrovial, in a joint venture (JV) with BAM, has been selected for three contracts to design and build 140 miles of track infrastructure for the High-Speed 2 (HS2) rail project in the UK.

The JV will deliver three sections of the route between Old Oak Common and Birmingham Curzon Street station.

The contract includes the design and installation of approximately 280 miles of track capable of speeds up to 225mph.

As principal contractor, the joint venture will also oversee logistics and support the testing and commissioning phase.

HS2 has also announced additional contracts to other contractors for Overhead Catenary Systems, Operational Telecommunications and Security Systems, and other critical components, with a combined value of approximately £3bn ($3.82bn).

These contracts are expected to generate tens of thousands of jobs throughout the UK.

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from up to 5 devices at once

Latest stories

spot_img